VDOT's ITS Architecture Banner
Virginia's Statewide and District ITS Architectures

 

Salem Smart Intersections Deployment Support

Project Description: This Project will assess Smart Intersection Deployment to support Vulnerable Road User Safety. The preliminary engineering phase will involve a review of the entire State to determine equipment installation locations. The intent is to test advanced traffic signal equipment and, if acceptable by the stakeholders and the contractor's IT Security team, and transfer ownership of the equipment to VDOT. The system will read signal phase data from signal controller via SDLC connection at Salem sites. Sites for testing were identified based on local knowledge of safety issues and locations identified in the VDOT Pedestrian and Bicycle Safety Plan (PBSAP).

Project Status: Planned

Project Stakeholders:
Project Inventory:

Project Service Packages: Project Information Flows:

Information Flow Source Element Destination Element Status
intersection geometry VDOT Salem District Field Equipment Vehicle - Connected Planned
intersection infringement info Vehicle - Connected VDOT Salem District Field Equipment Planned
intersection safety application info VDOT Southwestern TOC/ATMS VDOT Salem District Field Equipment Planned
intersection safety application status VDOT Salem District Field Equipment VDOT Southwestern TOC/ATMS Planned
intersection safety warning VDOT Salem District Field Equipment Vehicle - Connected Planned
intersection status VDOT Salem District Field Equipment Vehicle - Connected Planned
signal control commands VDOT Southwestern TOC/ATMS VDOT Salem District Field Equipment Existing
signal control status VDOT Salem District Field Equipment VDOT Southwestern TOC/ATMS Existing
vehicle characteristics Vehicle VDOT Salem District Field Equipment Existing
vehicle characteristics Vehicle Vehicle - Connected Planned
vehicle location and motion Vehicle - Connected VDOT Salem District Field Equipment Planned
vulnerable road user presence Vulnerable Road User Vehicle - Connected Planned


Project Functional Requirements (Element - Functional Object):

Standards:

Project Operational Concepts:

Last Updated 5/22/2026