VDOT's ITS Architecture Banner
Virginia's Statewide and District ITS Architectures

 

I-95 Ramp Metering System

Project Description: Ramp metering will be implemented at ramps on I–95 between Mile Marker 143 and Mile Marker 177. This area of I–95 is characterized by significant recurring and non–recurring congestion. It is also prone to a high number of incidents resulting in high person hours of delay. The ramp metering will enable mobility and safety benefits without negatively impacting operations on arterials. The I–95 Ramp Metering System includes a traffic signal — along with detectors and an advanced traffic signal controller — that are implemented in the field to regulate the flow of traffic entering the freeway according to current traffic conditions. Algorithms installed at the signal controller and in the advanced traffic management system (ATMS) provide the logic to manage the rate of vehicles entering the freeway and to coordinate ramp metering operations between adjacent ramps.

Project Status: Planned

Project Stakeholders:
Project Inventory:

Project Service Packages: Project Information Flows:

Information Flow Source Element Destination Element Status
roadway dynamic signage data VDOT NOVA MPSTOC - TOC/ATMS VDOT NOVA MPSTOC - TOC Ramp Meters Existing
roadway dynamic signage status VDOT NOVA MPSTOC - TOC Ramp Meters VDOT NOVA MPSTOC - TOC/ATMS Existing
traffic detector control VDOT NOVA MPSTOC - TOC/ATMS VDOT NOVA MPSTOC - TOC Detection Existing
traffic detector data VDOT NOVA MPSTOC - TOC Detection VDOT NOVA MPSTOC - TOC/ATMS Existing
traffic image meta data VDOT NOVA MPSTOC - TOC CCTV Cameras VDOT NOVA MPSTOC - TOC/ATMS Existing
traffic images VDOT NOVA MPSTOC - TOC CCTV Cameras VDOT NOVA MPSTOC - TOC/ATMS Existing
traffic metering control VDOT NOVA MPSTOC - TOC/ATMS VDOT NOVA MPSTOC - TOC Ramp Meters Existing
traffic metering status VDOT NOVA MPSTOC - TOC Ramp Meters VDOT NOVA MPSTOC - TOC/ATMS Existing
traffic operator data VDOT NOVA MPSTOC - TOC/ATMS VDOT TOC Operator Existing
traffic operator input VDOT TOC Operator VDOT NOVA MPSTOC - TOC/ATMS Existing
vehicle characteristics Vehicle VDOT NOVA MPSTOC - TOC Detection Existing
video surveillance control VDOT NOVA MPSTOC - TOC/ATMS VDOT NOVA MPSTOC - TOC CCTV Cameras Existing


Project Functional Requirements (Element - Functional Object):

Standards:

Project Operational Concepts:

Last Updated 5/29/2026