VDOT's ITS Architecture Banner
Virginia's Statewide and District ITS Architectures

 

NOVA Smart Intersections Deployment Support

Project Description: This Project will assess Smart Intersection Deployment to support Vulnerable Road User Safety. The preliminary engineering phase will involve a review of the entire State to determine equipment installation locations. The intent is to test advanced traffic signal equipment and, if acceptable by the stakeholders and IT Security team, and transfer ownership of the equipment to VDOT. The system will read signal phase data from signal controller is air gapped from VDOT systems at NOVA locations. Sites for testing were identified based on local knowledge of safety issues and locations identified in the VDOT Pedestrian and Bicycle Safety Plan (PBSAP).


Project Status: Planned

Project Stakeholders:
Project Inventory:

Project Service Packages: Project Information Flows:

Information Flow Source Element Destination Element Status
intersection geometry VDOT NOVA MPSTOC - Signal Center Field Equipment Vehicle - Connected Planned
intersection infringement info Vehicle - Connected VDOT NOVA MPSTOC - Signal Center Field Equipment Planned
intersection safety application info VDOT NOVA MPSTOC - Signal Center VDOT NOVA MPSTOC - Signal Center Field Equipment Planned
intersection safety application status VDOT NOVA MPSTOC - Signal Center Field Equipment VDOT NOVA MPSTOC - Signal Center Planned
intersection safety warning VDOT NOVA MPSTOC - Signal Center Field Equipment Vehicle - Connected Planned
intersection status VDOT NOVA MPSTOC - Signal Center Field Equipment Vehicle - Connected Planned
signal control commands VDOT NOVA MPSTOC - Signal Center VDOT NOVA MPSTOC - Signal Center Field Equipment Existing
signal control status VDOT NOVA MPSTOC - Signal Center Field Equipment VDOT NOVA MPSTOC - Signal Center Existing
vehicle characteristics Vehicle VDOT NOVA MPSTOC - Signal Center Field Equipment Existing
vehicle characteristics Vehicle Vehicle - Connected Planned
vehicle location and motion Vehicle - Connected VDOT NOVA MPSTOC - Signal Center Field Equipment Planned
vulnerable road user presence Vulnerable Road User Vehicle - Connected Planned


Project Functional Requirements (Element - Functional Object):

Standards:

Project Operational Concepts:

Last Updated 5/29/2026