VDOT Fredericksburg District Maintenance and Construction Vehicles

Status:

Existing

Definition:

This category represents the maintenance and construction fleets operated by the Fredericksburg maintenance and construction centers. AVL features are planned.

Stakeholder:

VDOT Fredericksburg District Residencies

Systems Interconnected
with the VDOT Fredericksburg District Maintenance and Construction Vehicles


Architecture Flow Diagrams
which include VDOT Fredericksburg District Maintenance and Construction Vehicles:

Architecture Flows
to/from the VDOT Fredericksburg District Maintenance and Construction Vehicles:

VDOT Fredericksburg District Maintenance and Construction Vehicles flows into icon VDOT Fredericksburg District Maintenance and Construction Residencies VDOT ESS Weather Platformflows into iconVDOT Fredericksburg District Maintenance and Construction Vehicles VDOT Fredericksburg District Maintenance and Construction Residenciesflows into iconVDOT Fredericksburg District Maintenance and Construction Vehicles

National ITS Architecture Subsystems
mapped to the VDOT Fredericksburg District Maintenance and Construction Vehicles:

National ITS Architecture Services
associated with VDOT Fredericksburg District Maintenance and Construction Vehicles:

National ITS Architecture Functional Requirements
associated with VDOT Fredericksburg District Maintenance and Construction Vehicles:

MCV Vehicle Location Tracking
  1. The maintenance and construction vehicle shall track its current location.
  2. The maintenance and construction vehicle shall send the time stamped vehicle location to the controlling center.
MCV Vehicle System Monitoring and Diagnostics
  1. The maintenance and construction vehicle shall collect vehicle diagnostics and operating status data from the maintenance vehicle platform including engine temperature, mileage, tire wear, brake wear, belt wear, and other operational status measures as well as the status of maintenance and construction-specific systems on the vehicle.
  2. The maintenance and construction vehicle shall use the diagnostic and status information to support scheduling vehicle maintenance, monitoring safety status, and informing the vehicle operator of the conditions.
  3. The maintenance and construction vehicle shall send the vehicle diagnostic and safety information to the controlling maintenance center.
MCV Winter Maintenance
  1. The maintenance and construction vehicle shall track the location and status of safety systems on-board the vehicle.
  2. The maintenance and construction vehicle shall respond to dispatch information from the center, presented to the vehicle operator for acknowledgement and returning status.
  3. The maintenance and construction vehicle shall send operational data to the center including the operational state of the maintenance equipment (e.g., blade up/down, spreader pattern), types and quantities of materials used for construction and maintenance activities, and a record of the actual work performed.
MCV Roadway Maintenance and Construction
  1. The maintenance and construction vehicle shall track the location and status of safety systems on-board the vehicle.
  2. The maintenance and construction vehicle shall respond to dispatch information from the center, presented to the vehicle operator for acknowledgement and returning status.
  3. The maintenance and construction vehicle shall send operational data to the center including the operational state of the maintenance equipment (e.g., blade up/down, spreader pattern), types and quantities of materials used for construction and maintenance activities, and a record of the actual work performed.