FDOT District 6 Smart Work Zone Management for Okeechobee Road
Project Description: FDOT District 6 Smart Work Zone (SWZ) Management for SR 25/US 27/Okeechobee Road Reconstruction Projects is currently ongoing,with two reconstruction segments completed. FPID 423251 2 52 01 was completed on October 17, 2023, and FPID 423251 5 52 01 was completed on January 16, 2026.
Project Status: On-going
Project Stakeholders:
Interconnect and Flow

Diagrams
Project Service Packages:
Project Information Flows:
Project Functional Requirements (Element - Functional Object):
-
FDOT District 6 Maintenance Systems and Dispatch - MCM Work Zone Safety Management
-
1: The center shall provide remote monitoring and control of work zone safety devices - including intrusion detection devices that have been installed in work zones or maintenance areas.
-
3: The center shall collect status information of work zone safety device status from field equipment or the maintenance and construction vehicles.
-
4: The center shall collect and store work zone data collected from work zone monitoring devices (such as intrusion detection or alert devices and speed monitoring devices) on-board the vehicle and at the roadside.
-
FDOT District 6 Maintenance Vehicles - MCV Vehicle Safety Monitoring
-
3: The maintenance and construction vehicle shall receive work zone warnings from the field equipment at the roadside or other maintenance and construction vehicles.
-
4: The maintenance and construction vehicle shall present work zone warnings to the vehicle operator or field personnel using direct warning signals or in-vehicle signage functions.
-
6: The maintenance and construction vehicle shall provide status of the work zone warning systems to the center.
-
FDOT District 6 Maintenance Vehicles - Vehicle Basic Safety Communication
-
7: The vehicle shall receive warnings, informational road signs, traffic meters, and signals provided by infrastructure devices.
-
FDOT District 6 SunGuide Field Equipment - Roadway Work Zone Safety
-
6: The field element shall provide operational status for the work zone intrusion detection devices to the maintenance center.
-
FDOT District 6 SunGuide Field Equipment - RSE Work Zone Safety
-
5: The field element shall provide traffic situation data near a work zone to nearby field equipment
-
6: The field element shall provide status of the work zone warning application, including faults with the equipment to the center.
Standards:
Project Operational Concepts:
Last Updated 11/3/2026