Interface: PRT Offices - Western Region Traffic Management Center (PennDOT)

PRT Offices to Western Region Traffic Management Center (PennDOT) Interface Diagram

Information Flow Definitions

current infrastructure restrictions  (Future)  Selected Comm Solution

Restrictions levied on transportation asset usage based on infrastructure design, surveys, tests, or analyses. This includes standard facility design height, width, and weight restrictions, special restrictions such as spring weight restrictions, and temporary facility restrictions that are imposed during maintenance and construction.

fare and price information  (Future)  Selected Comm Solution

Current transit, parking, and toll fee schedule information.

incident information  (Future)  Selected Comm Solution

Notification of existence of incident and expected severity, location, time and nature of incident. As additional information is gathered and the incident evolves, updated incident information is provided. Incidents include any event that impacts transportation system operation ranging from routine incidents (e.g., disabled vehicle at the side of the road) through large–scale natural or human–caused disasters that involve loss of life, injuries, extensive property damage, and multi–jurisdictional response. This also includes special events, closures, and other planned events that may impact the transportation system.

incident report  (Future)  

Report of an identified incident including incident location, type, severity and other information necessary to initiate an appropriate incident response.

incident response coordination  (Future)  

Incident response procedures and current incident response status that are shared between allied response agencies to support a coordinated response to incidents. This flow provides current situation information, including a summary of incident status and its impact on the transportation system and other infrastructure, and current and planned response activities. This flow also coordinates a positive hand off of responsibility for all or part of an incident response between agencies.

incident response status  (Future)  Selected Comm Solution

Status of the current incident response including a summary of incident status and its impact on the transportation system, traffic management strategies implemented at the site (e.g., closures, diversions, traffic signal control overrides), and current and planned response activities.

maint and constr work plans  (Future)  Selected Comm Solution

Future construction and maintenance work schedules and activities including anticipated closures with anticipated impact to the roadway, alternate routes, anticipated delays, closure times, and durations.

road network conditions  (Future)  Selected Comm Solution

Current and forecasted traffic information, road and weather conditions, and other road network status. Either raw data, processed data, or some combination of both may be provided by this flow. Information on diversions and alternate routes, closures, and special traffic restrictions (lane/shoulder use, weight restrictions, width restrictions, HOV requirements) in effect is included.

road weather information  (Future)  Selected Comm Solution

Road conditions and weather information that are made available by road maintenance operations to other transportation system operators.

roadway maintenance status  (Future)  Selected Comm Solution

Summary of maintenance fleet operations affecting the road network. This includes the status of winter maintenance (snow plow schedule and current status).

toll data  (Future)  Selected Comm Solution

Current toll schedules for different types of vehicles as well as advanced toll payment information.

toll data request  (Future)  Selected Comm Solution

Request made to obtain toll schedule information or pay a toll in advance. The request can be a subscription that initiates as–needed information updates as well as a one–time request for information.

traffic images  (Existing)  

High fidelity, real–time traffic images suitable for surveillance monitoring by the operator or for use in machine vision applications. This flow includes the images. Meta data that describes the images is contained in another flow.

transit incident information  (Future)  Selected Comm Solution

Information on transit incidents that impact transit services for public dissemination.

transportation system status  (Future)  Selected Comm Solution

Current status and condition of transportation infrastructure (e.g., tunnels, bridges, interchanges, TMC offices, maintenance facilities). In case of disaster or major incident, this flow provides an assessment of damage sustained by the surface transportation system including location and extent of the damage, estimate of remaining capacity and necessary restrictions, and time frame for repair and recovery.

work plan feedback  (Future)  Selected Comm Solution

Comments and suggested changes to proposed construction and maintenance work schedules and activities. This information influences work plan schedules so that they minimize impact to other system operations and the overall transportation system.

work zone information  (Future)  Selected Comm Solution

Summary of maintenance and construction work zone activities affecting the road network including the nature of the maintenance or construction activity, location, impact to the roadway, expected time(s) and duration of impact, anticipated delays, alternate routes, and suggested speed limits. This information may be augmented with images that provide a visual indication of current work zone status and traffic impacts.