hri_phase_data
This data flow contains data about the way in which each railroad grade crossing and interlocked intersection(s) operate, i.e. the minimum and maximum phase timings, phase change timings, etc.
Sub Data Flows
- Primitive Element
Parent Data Flows
Associated PSpecs
- None