m_and_c_roadway_needs_to_scheduler

This data flow is used within the Manage Maintenance and Construction function and assists the maintenance activity scheduler by providing the roadway maintenance plan, materials, and vehicle requirements, together with the time and date needed. The data flow consists of the following data items each of which is defined in its own DDE:

list_size + list_size{roadway_maint_plan
+ mcv_vehicle_type
+ m_and_c_materials_type
+ m_and_c_materials_quantity
+ need_date
+ need_time}


Sub Data Flows

Parent Data Flows

Associated PSpecs