SCAT Transit Signal Priority
Project Description: This project would install transit signal priority in Sarasota County.
Project Status: Planned
Project Stakeholders: 
             
             
                  Interconnect and Flow
                  
Diagrams
             
: 
Project Information Flows: 
Project Functional Requirements (Element - Functional Object): 
  - 
Sarasota County Field Equipment - Roadway Signal Control
  
    - 
1: The field element shall control traffic signals under center control.
    
- 
10: The field element shall receive request for transit vehicle signal priority.
    
- 
8: The field element shall report current transit priority status to the center.
    
  - 
Sarasota County SCAT Dispatch - Transit Center Priority Management
  
    - 
1: The center shall analyze transit vehicle schedule performance to determine the need for priority along certain routes or at certain intersections.
    
  - 
Sarasota County SCAT Fixed Route Transit Vehicles - Transit Vehicle Signal Priority
  
    - 
2: The transit vehicle shall send priority requests to traffic signal controllers at intersections, pedestrian crossings, and multimodal crossings on the roads (surface streets) and freeway (ramp controls) network that enable a transit vehicle schedule deviation to be corrected.
    
  - 
Sarasota County TMC - TMC Signal Control
  
    - 
1: The center shall remotely control traffic signal controllers.
    
Standards: 
Project Operational Concepts: 
Roles and Responsibilities
Last Updated 8/25/2025