City of Sarasota ATMS Network Switch Upgrade
Project Description: This project will  upgrade switches to higher speeds to handle CCTV and CV.
Project Status: Planned
Project Stakeholders: 
             
             
                  Interconnect and Flow
                  
Diagrams
             
: 
Project Information Flows: 
Project Functional Requirements (Element - Functional Object): 
  - 
City of Sarasota CAV Field Equipment - RSE Situation Monitoring
  
    - 
1: The field element shall collect traffic-related data including snapshots of measured speed and heading and events including starts and stops, speed changes, and other vehicle control from vehicles.
    
- 
2: The field element shall provide vehicle situation data to a center for archival.
    
- 
3: The field element shall provide data collection parameters to vehicles.
    
- 
5: The field element shall provide collected vehicle situation and local sensor data to data distribution centers.
    
  - 
City of Sarasota CAV Field Equipment - RSE Traffic Monitoring
  
    - 
1: The field element shall communicate with on-board equipment on passing vehicles to collect current vehicle position, speed, and heading and a record of previous events (e.g., starts and stops, link travel times) that can be used to determine current traffic conditions.
    
- 
2: The field element shall aggregate and forward collected probe information to the center.
    
  - 
City of Sarasota TMC - TMC Basic Surveillance
  
    - 
1: The center shall monitor, analyze, and store traffic sensor data (speed, volume, occupancy) collected from field elements under remote control of the center.
    
- 
2: The center shall monitor, analyze, and distribute traffic images from CCTV systems under remote control of the center.
    
- 
7: The center shall remotely control devices to detect traffic.
    
  - 
City of Sarasota Traffic Control Equipment - Roadway Basic Surveillance
  
    - 
1: The field element shall collect, process, digitize, and send traffic sensor data (speed, volume, and occupancy) to the center for further analysis and storage, under center control.
    
- 
2: The field element shall collect, process, and send traffic images to the center for further analysis and distribution.
    
- 
5: The field element shall return sensor and CCTV system fault data to the controlling center for repair.
    
Standards: 
Project Operational Concepts: 
Roles and Responsibilities
- City of Sarasota
- Collect vehicle probe data for travel time dissemination.
- Coordinate traffic information and control with Sarasota County.
- Operate and maintain closed-circuit televisions (CCTVs) and field sensors.
- Operate traffic signal systems for the City of Sarasota.
Last Updated 8/25/2025