FDOT I-75 Arterial DMS
Project Description: This project will install DMS on arterials leading to I–75 in FDOT District 1. This is a multi–phased project in which DMS will be installed in Charlotte, Manatee, Sarasota, Lee and Collier counties in different phases.
Project Status: Planned
Project Stakeholders: 
             
             
                  Interconnect and Flow
                  
Diagrams
             
: 
Project Information Flows: 
Project Functional Requirements (Element - Functional Object): 
  - 
FDOT District 1 Field Equipment - Roadway Traffic Information Dissemination
  
    - 
1: The field element shall include dynamic message signs for dissemination of traffic and other information to drivers, under center control; the DMS may be either those that display variable text messages, or those that have fixed format display(s) (e.g. vehicle restrictions, or lane open/close).
    
  - 
FDOT SWIFT Center - TMC Traffic Information Dissemination
  
    - 
1: The center shall remotely control dynamic messages signs for dissemination of traffic and other information to drivers.
    
- 
12: The center shall receive alert notification of a major emergency such as a natural or man-made disaster, civil emergency, or child abduction for distribution to the public from emergency management.
    
- 
13: The center shall receive low emission zone information from emission management.
    
- 
3: The center shall collect operational status for the driver information systems equipment (DMS, HAR, etc.).
    
Standards: 
Project Operational Concepts: 
Roles and Responsibilities
Last Updated 8/25/2025