City of Lakeland Bus Rapid Transit
Project Description: This project would deploy Bus Rapid Transit in the City of Lakeland, including TSP.
Project Status: Planned
Project Stakeholders: 
             
             
                  Interconnect and Flow
                  
Diagrams
             
: 
Project Information Flows: 
Project Functional Requirements (Element - Functional Object): 
  - 
City of Lakeland Advanced Traffic Management System - TMC Signal Control
  
    - 
1: The center shall remotely control traffic signal controllers.
    
  - 
City of Lakeland Field Equipment - Roadway Signal Control
  
    - 
1: The field element shall control traffic signals under center control.
    
- 
10: The field element shall receive request for transit vehicle signal priority.
    
- 
6: The field element shall return traffic signal controller operational status to the center.
    
- 
8: The field element shall report current transit priority status to the center.
    
  - 
Lakeland Citrus Connection Transit Vehicles - Transit Vehicle Signal Priority
  
    - 
2: The transit vehicle shall send priority requests to traffic signal controllers at intersections, pedestrian crossings, and multimodal crossings on the roads (surface streets) and freeway (ramp controls) network that enable a transit vehicle schedule deviation to be corrected.
    
- 
4: The transit vehicle shall prevent a priority request from being sent when the transit vehicle cannot use the priority (e.g., when the transit vehicle makes a passenger stop on the approach to an intersection).
    