Interface: NCDOT Triangle RTMC - Private Traveler Information Systems

NCDOT Triangle RTMC to Private Traveler Information Systems Interface Diagram

Architecture Flow Definitions

alert notification  (Planned)  Applicable ITS Standards

Notification of a major emergency such as a natural or man–made disaster, civil emergency, or child abduction for distribution to the public. The flow identifies the alert originator, the nature of the emergency, the geographic area affected by the emergency, the effective time period, and information and instructions necessary for the public to respond to the alert. This flow may also identify specific information that should not be released to the public.

alert status  (Planned)  Applicable ITS Standards

Information indicating the current status of the emergency alert including identification of the traveler and driver information systems that are being used to provide the alert.

amber and silver alert_ud  (Existing/Planned)  

Amber alert information to be placed on dynamic message signs controlled by a traffic management element or on the emergency alert system (EAS).

current infrastructure restrictions  (Existing/Planned)  Applicable ITS Standards

Restrictions levied on transportation asset usage based on infrastructure design, surveys, tests, or analyses. This includes standard facility design height, width, and weight restrictions, special restrictions such as spring weight restrictions, and temporary facility restrictions that are imposed during maintenance and construction.

incident information for public  (Existing/Planned)  Applicable ITS Standards

Report of current desensitized incident information prepared for public dissemination.

incident information.  (Existing/Planned)  

Notification of existence of incident and expected severity, location, time and nature of incident. As additional information is gathered and the incident evolves, updated incident information is provided. Incidents include any event that impacts transpor

maint and constr work plans  (Existing/Planned)  Applicable ITS Standards

Future construction and maintenance work schedules and activities including anticipated closures with anticipated impact to the roadway, alternate routes, anticipated delays, closure times, and durations.

road network conditions  (Planned)  Applicable ITS Standards

Current and forecasted traffic information, road and weather conditions, and other road network status. Either raw data, processed data, or some combination of both may be provided by this flow. Information on diversions and alternate routes, closures, and special traffic restrictions (lane/shoulder use, weight restrictions, width restrictions, HOV requirements) in effect is included.

road network traffic situation data  (Planned)  Applicable ITS Standards

Aggregated route usage, travel times, and other aggregated data collected from probe vehicles that can be used to estimate current traffic conditions.

roadway maintenance status  (Existing/Planned)  Applicable ITS Standards

Summary of maintenance fleet operations affecting the road network. This includes the status of winter maintenance (snow plow schedule and current status).

traffic control information  (Existing/Planned)  Applicable ITS Standards

Represents the flow of traffic control and status information from a TMC to a third party TIC. This is reporting only, not actual control.

traffic flow.  (Existing)  

Raw and/or processed traffic detector data which allows derivation of traffic flow variables (e.g., speed, volume, and density measures) and associated information (e.g., congestion, potential incidents). This flow includes the traffic data and the operat

traffic images  (Existing/Planned)  Applicable ITS Standards

High fidelity, real–time traffic images suitable for surveillance monitoring by the operator or for use in machine vision applications. This flow includes the images and meta data that describes the images.

traffic images.  (Existing)  

High fidelity, real–time traffic images suitable for surveillance monitoring by the operator or for use in machine vision applications. This flow includes the images and the operational status of the surveillance system.

work zone information  (Existing/Planned)  Applicable ITS Standards

Summary of maintenance and construction work zone activities affecting the road network including the nature of the maintenance or construction activity, location, impact to the roadway, expected time(s) and duration of impact, anticipated delays, alternate routes, and suggested speed limits. This information may be augmented with images that provide a visual indication of current work zone status and traffic impacts.